City of Milwaukee
 

Upcoming Road Construction

2008 Paving Projects in the 6th Aldermanic District

  • N. Pierce St. (Elimination of Railroad Crossing) – A point South of East Concordia to a point South of East Concordia Ave.
  • Riverwest Recreation Trail
  • N. Booth St. – N. 6th St. to North-South Freeway
  • E. Concordia Av.(Elimination of Railroad Crossing) – A point 200’ +/- East of N. Booth St. to N. Booth St.
  • Alley below N. Buffum St., E. Keefe Av., N. Richards St., E. Townsend St. (Northerly 120 feet m/l)
  • N. 1st St. – W. Concordia Ave. to W. Keefe Ave.

 


2009 Paving Projects in the 6th Aldermanic District

  • W. Capitol Dr., W. Atkinson., N. Teutonia Av.
  • N. Humboldt Av. Structure over Milwaukee River
  • N. 3rd St - W. Auer Ave. to W. Concordia Ave.
  • N. 6th St. – W. Garfield Ave. to W. Concordia Ave.
  • N. Buffum St. (Elimination of Railroad Crossing) a point 300’ +/- South of E. Keefe Ave. to E. Keefe Ave.
  • N. Holton St. – The Milwaukee River to N. Commerce St.
  • N. Holton St. (Elimination of Railroad Crossing) – A point 100 +/- South of E. Townsend St. to E. Townsend St.
  • N. Hubbard St. – E. North Ave. to E. Wright St.
  • N. Humboldt Av. Structure & Approaches – Over N. Commerce St./N. Riverboat Rd.
  • N. Richards St. (Elimination of Railroad Crossing) – E. Keefe Ave. to a point 300’ +/- north of E. Keefe Ave.
  • E. Townsend St. Elimination of Railroad Crossing) – N. Holton St. to a point 120 +/- West of N. Holton St.
  • Alley below W. Brown St., N. Dr. Martin Luther King Jr. Dr., W. Lloyd St., N. 2nd St.
  • W. Center St. (Excluding Structure) – N. Dr. Martin Luther King Jr. Dr. to N. 12th St.
  • E/W. Keefe Ave. - N. Humboldt Blvd. to N. Port Washington Rd.
     

This site is powered by the Northwoods Titan Content Management System